10. THIS ILLUSTRATION SHOWS THE CORRECT LOCATION FOR THE ROLLERS. THE SMALLER ROLLER GOES ON THE TOP GUIDE AT THE LOWER REAR. THE LARGER ROLLER GOES IN THE CENTER OF THE LOWER GUIDE. A SECOND SET OF ROLLERS IS SUPPLIED AS SPARES. 11. REMOVE THE REAR SHOCK AND REMOVE THE SPRING. INSTALL THE SHOCK AND BOTTOM THE SUSPENSION TO CHECK FOR CLEARANCE THROUGH THE ENTIRE MOTION. ROTATE THE GUIDE ASSEMBLY CW/CCW A SMALL AMOUNT IF NECESSARY. IF THERE IS AN INTERFERENCE, A PORTION OF THE GUIDE MAY NEED TO BE RELIEVED. A WIDER SPINDLE CAN ALSO ACHIEVE MORE ROOM. AFTER YOU HAVE CHECKED FOR CLEARANCE, PUT THE SPRING ON THE SHOCK AND RE-INSTALL.
12. ATTACH THE STAY TO THE FRAME ANY WAY YOU CAN. THIS INSTALLATION TAKES ADVANTAGE OF THE SHOCK MOUNT BOLT. SOME INSTALLATIONS MAY REQUIRE A RIV-NUT IN THE FRAME JUST AS A WATER BOTTLE CAGE IS MOUNTED. THE 5MM NYLOC NUT FASTENS THE STAY TO THE 5 X 25 SCREW ON THE BACKSIDE OF THE GUIDE PLATE. (INT’L ST’D MOUNTING DOES NOT REQUIRE THIS STRAP.)
13. AFTER LOCATING THE MOUNT PLATE WITH THE STAY, FINISH ASSEMBLING THE UPPER AND LOWER GUIDES.